The short answer

Checked against Google Meet Help and Google Workspace Updates, October 12 and 19, 2026

In the meeting organizer's Google Drive: My Drive Google Meet the meeting's folder

Who gets a link
The organizer and whoever started the recording get an email. The link is also added to the Calendar event if recording started at the scheduled time.
Older recordings
Recordings from before July 2026 are in Legacy Meet Recordings, inside the Google Meet folder.
Not in your Drive?
You weren't the organizer. The file is in their Drive, not yours. Open the email link, look for a shortcut in your own Google Meet folder, or ask them to share it.
Keep your own copy
Record with Scribbl's Chrome extension. The video, a transcript with speaker names and AI notes land in your own account, with no bot in the call. It works when you're not the host and on free Gmail.
Start free

Try Scribbl

Keep every Meet recording in your account

Scribbl records, transcribes, and summarizes your Google Meet calls from your browser. No bot joins the call. Free for 10 meetings a month, no credit card.

Add to Chrome · It's free

Google Meet recordings go to the meeting organizer's Google Drive, in a folder called "Google Meet," with a sub-folder for each meeting. A link is also emailed to the organizer and to whoever started the recording, and added to the Google Calendar event. If you weren't the organizer, the Google Meet recording is in the organizer's Drive, not yours; Scribbl records Google Meet from your own browser, with nothing joining the call, and keeps the video, a transcript with speaker names and AI notes in your own Scribbl account, even on free Gmail.

The catch is the word organizer. The file goes to whoever created the calendar event, not to you, even if you pressed Record. Google changed the folder in July 2026: the old "Meet Recordings" folder was renamed "Legacy Meet Recordings" and moved inside the Google Meet folder, so older recordings are there. If you recorded a call and can't find the video, you are probably looking in the wrong Drive.

Where Google Meet recordings are saved

When you use Google Meet's built-in recorder, the finished MP4 is stored in one place: the Google Meet folder in the organizer's My Drive, in a sub-folder for that meeting. That is the Google Meet recording location for every meeting, whoever pressed Record. Not the person who clicked Record. Not every participant. The organizer. Google Meet never saves a copy of the recording in a guest's Drive, so to have your own copy of every Google Meet without asking the organizer, record it yourself with Scribbl, which saves the video, transcript and notes to your Scribbl account whoever organized the call.

Since July 2026, Meet puts recordings, transcripts and Gemini notes for a meeting in the same sub-folder, and all the meetings in a recurring series share one sub-folder. Attendees who have access to the files see shortcuts to them in their own Google Meet folder in Drive, but the file itself stays in the organizer's Drive. (Source: Google Workspace Updates, July 22, 2026.)

What Meet savesWhere it's savedWho gets the email linkAdded to the Calendar event
Recording (MP4)Organizer's Drive, Google Meet folder, meeting sub-folderThe organizer and the person who started the recordingYes, if recording started at the scheduled time
Transcript (Google Doc)Same meeting sub-folderThe host, co-hosts and the person who started the transcriptYes
Gemini notes (Google Doc)Same meeting sub-folderWhoever the organizer's sharing setting includesYes

Sources: Google Meet Help pages on recording, transcripts and Take notes for me, checked October 12, 2026.

How to find a Google Meet recording: Drive, Gmail and Calendar

To find a Google Meet recording, check three places in order: the organizer's Google Drive (My Drive, then the Google Meet folder), the email Google sends to the organizer and to whoever started the recording, and the Google Calendar event. The Drive folder holds the actual file, and the email and Calendar links are shortcuts back to it. If none of the three has the Google Meet recording because someone else organized the meeting, ask the organizer to share it, and record the next one with Scribbl so the video and transcript are in your own account.

  1. 1

    Google Drive

    Open drive.google.com signed in as the account that organized the meeting. Click My Drive, open the 'Google Meet' folder, then the sub-folder for the meeting. Recordings from before July 2026 are in 'Legacy Meet Recordings,' inside the Google Meet folder. On a phone, open the Google Drive app and go to the same folder.

  2. 2

    Your email inbox

    The organizer and the person who started the recording get an email with a link once the file is ready. Search your inbox for the meeting name or 'recording'.

  3. 3

    The Calendar event

    If recording started at the scheduled meeting time, the link is attached to the Google Calendar event. Open the event and look in the attachments.

Where to look, in order Source: Google Meet Help, support.google.com/meet/answer/9308681, checked October 12, 2026.
Google Drive

My Drive

  • Google Meet folder
  • Shared with me
  • Recent
Illustration Illustration of My Drive. Since July 2026, Meet saves recordings in the 'Google Meet' folder, with a sub-folder for each meeting. Older recordings are in 'Legacy Meet Recordings,' inside the Google Meet folder.

If you don't want to open folders one by one, type part of the meeting title into the Drive search bar. Recording files carry the meeting title and date in the name, so they're easy to find by title.

To share or download the recording, select the file in Drive, then use Share or More and Download. If you can see the file but can't download it, the organizer's download setting is blocking you, and only they can change it.

Who owns a Google Meet recording: the organizer, not you

This is the part most people get wrong. The recording is owned by the meeting organizer, meaning the person who created the Calendar event. It is not owned by the person who clicked Record.

A few real situations follow from that:

  • You're a guest in a client's meeting and you press Record. The file goes to the client's Drive. You get the email link as the person who started it, but the client controls who can open it.
  • You're in the same company as the organizer. Google gives participants in the organizer's organization access to the recording automatically, and since July 2026 you see a shortcut in your own Google Meet folder.
  • The organizer changed, or the meeting ran outside its scheduled time. The recording link goes to the original event creator, which is not always who you expect.
  • You're from another company and didn't press Record. You get no email and no automatic access. The organizer has to share it with you.

"You can't copy. This event has been recorded." What it means

If Google Calendar tells you that you can't copy an event because it has been recorded, the event's Google Meet call was recorded and the recording belongs to that original event. Since September 2025, Google doesn't carry the Meet call over when you copy or duplicate a Calendar event, so recordings and notes stay with the original event and the people invited to it. (Source: Google Workspace Updates, September 2025.)

What to do instead:

  • To find the recording, open the original event, not a copy. The link is in its attachments if recording started at the scheduled time, and the file is in the organizer's Drive, in the Google Meet folder.
  • To reuse the event, create a new event, or duplicate it and add a new Google Meet video call. If everyone should join the same call, paste the original Meet link into the new event yourself.
  • To give the recording to new people, the organizer shares the file from Drive.

Can't find it because you weren't the host? Keep your own copy with Scribbl

This is the dead end most people reach on this page. Google's recording lives in the organizer's Drive, and Google offers no way to pull your own copy out of it. If the organizer doesn't share it, or nobody pressed Record, there is nothing for you to find.

The fix for the next meeting is to keep your own copy. Scribbl is a Chrome extension that records Google Meet with nothing joining the call. It doesn't use Google's recorder, so it works when you're not the host, when you're a guest in another company's meeting, and on a free Gmail account. Nobody's admin has to turn anything on.

A Google Meet call with the Scribbl Chrome extension showing Live at the top left, and the Scribbl meeting page for Project status review with a summary and 3 action items.
A Google Meet call recorded with the Scribbl Chrome extension, with nothing joining the call, and the Scribbl meeting page right after it with a summary and the action items.

After every meeting, you get in your own Scribbl account:

  • The video recording, with a link you can share.
  • A transcript with speaker names, searchable by what was said.
  • AI notes and action items, ready right after the call.

You never have to ask an organizer for a file again, and you never wait on someone else's Drive. Recordings are private by default, and Scribbl doesn't use your meetings to train AI for anyone other than you.

The free plan includes Google Meet, Zoom and Microsoft Teams, with 10 meetings a month. Scribbl Pro is $13 per user per month billed annually, or $20 monthly. Zoom and Teams use Scribbl Desktop for Mac and Windows. On Pro, you can connect Scribbl to ChatGPT or Claude and ask about past meetings, Smart Collections sort your meetings by themselves, and Automations do the follow-up, such as drafting the follow-up email or posting the notes to Slack. Automations ask before they change anything.

Whatever you record with, tell everyone in the meeting that you're recording. See do you have to tell people you're recording.

How long until a Google Meet recording is available

Google Meet recordings are not instant. Google has to process the file before it appears in Drive or the email goes out, and Google doesn't give a fixed time. Longer meetings take longer.

If you recorded captions, the video can be ready before the captions are. Google says captions can take several hours to become playable. If the file in Drive shows "Still processing," you can already download it: select the file, click More, then Download. (Sources: Google Meet Help, recording and troubleshooting pages.)

A single recording can run up to 8 hours. After that, Google stops it automatically.

What's in the Google Meet folder besides the video

A native Google Meet recording is an MP4 video file. Two things people expect to find with it:

  • A transcript. The recording doesn't include one. Google's transcripts are a separate feature that someone has to turn on during the call, on some plans only, and they're saved as their own Google Doc in the same sub-folder. If a transcript is what you need, see the Google Meet recording transcript guide.
  • The chat. When continuous meeting chat is off, Meet saves the in-meeting chat as an .SBV file in the organizer's Drive. See how to save the chat from a Google Meet.

A recording is a video you have to re-watch. It doesn't tell you what was decided or who owns the next step. Scribbl gives you the AI notes and action items along with the video, so you don't have to scrub through an hour of footage.

Why your Google Meet recording is missing

If you waited and the recording still isn't there, walk these in order:

  1. It's still processing. Long meetings take longer. Check the email and Drive again later.
  2. You're signed into the wrong account. A personal Gmail when the meeting ran on your work account, or the other way round. Switch accounts and check Drive and Gmail again.
  3. You're not the organizer. The file is in the organizer's Drive. See who owns a Google Meet recording.
  4. The organizer or the time changed. The link goes to the original event creator. Ask them.
  5. It never recorded. Google's recorder needs a paid plan, recording turned on by the admin, and permission in that meeting. It doesn't work in breakout rooms or on an iPhone, and it stops working if Google Drive is turned off for the account. See why you can't record a Google Meet and how to record a Google Meet. On Teams instead, see how to record a Teams meeting.
  6. Someone deleted it. Deleted files sit in the organizer's Drive Trash for 30 days before Google deletes them for good. The organizer can restore it from there.

If the answer is 3, 4 or 5, the recording is out of your reach. That's the case for keeping your own copy with Scribbl.

Google Meet recording vs your own copy with Scribbl

Scribbl
  • Where it's saved: your own Scribbl account
  • Who can record: anyone in the call, host or not, including guests in another company's meeting
  • Setup: a Chrome extension; nothing joins the call
  • What you get: the video, a transcript with speaker names, AI notes and action items
  • Cost: free plan with 10 meetings a month, including on free Gmail; Pro $13 per user per month billed annually, or $20 monthly
Google Meet recorder
  • Where it's saved: the organizer's Google Drive
  • Who can record: the host, co-hosts and people in the host's organization
  • Setup: a paid plan, and an admin has to turn recording on
  • What you get: a video; transcripts and Gemini notes are separate features on some plans
  • Cost: Business Standard or higher, or Google One with 2 TB or more; not free Gmail
Your own copy with Scribbl vs Google Meet's recorder Google facts checked October 12, 2026 on Google Meet Help. Scribbl pricing as of October 2026.

Where Google Meet recordings go: FAQ

Where are Google Meet recordings saved?

In the meeting organizer's Google Drive, in a folder named Google Meet under My Drive, with a sub-folder for each meeting. Recordings from before July 2026 are in Legacy Meet Recordings, inside the Google Meet folder. A link is also emailed to the organizer and to whoever started the recording, and attached to the Calendar event if recording started at the scheduled time. If you weren't the organizer, the file is in the organizer's Drive, not yours; Scribbl records Google Meet with nothing joining the call and keeps your own copy of the video, transcript and notes in your Scribbl account.

I recorded the meeting, so why is it not in my Drive?

Because the file belongs to the organizer, not to the person who pressed Record. If you didn't create the Calendar event, the recording is in the organizer's Drive. Check the email Google sent you, look for a shortcut in your own Google Meet folder, or ask the organizer to share it.

Can I find a Google Meet recording if I wasn't the host?

Only if you started the recording (you get the email link), you're in the organizer's organization (you get access automatically), or the organizer shares it with you. Otherwise you have to ask the organizer. To have your own copy of every meeting, record with Scribbl, which saves the video, a transcript with speaker names and AI notes in your own account, with nothing joining the call.

What if nobody recorded the Google Meet?

Then there is no recording to find. Google only saves a file when someone presses Record, and only on plans that include recording. To make sure the next meeting is saved, use Scribbl's Chrome extension: it works when you're not the host and on free Gmail, and the free plan includes 10 meetings a month.

How long does a Google Meet recording take to show up?

Google doesn't give a fixed time. The file has to finish processing first, and longer meetings take longer. Captions can become playable a few hours after the video. If the file shows Still processing, you can already download it.

Does a Google Meet recording include a transcript or the chat?

No. The recording is a video file. Transcripts are a separate Google feature on some plans, saved as their own file in the same folder. The chat is saved as an .SBV file when continuous meeting chat is off. Scribbl gives you the video, a transcript with speaker names, AI notes and action items for every meeting it records.

Where do Google Meet recordings go on a free Gmail account?

Nowhere, because free Gmail doesn't include Google's recorder. Recording needs a paid Google Workspace edition such as Business Standard, or a Google One plan with 2 TB or more. On free Gmail, Scribbl records Google Meet and saves it to your own Scribbl account.

Are Google Meets recorded?

Not automatically. A Google Meet is only recorded if someone in the call presses Record, or if the host set the meeting to record by itself, and only on plans that include recording. Everyone in the call gets a notification when a recording starts or stops, including people outside the organizer's company.

How do I get, retrieve or access a Google Meet recording?

If you organized the meeting, open Google Drive, then My Drive, the Google Meet folder and the meeting's sub-folder, or open the link in the email Google sent or in the Calendar event. If someone else organized it, open the email link if you started the recording, look for a shortcut in your own Google Meet folder if you're in the organizer's company, or ask the organizer to share the file. To download it, select the file in Drive, click More, then Download.

Can Google Meet record automatically?

Yes, on plans that include recording. When the host creates the meeting, they can open Video call options, then Meeting records, and select Record the meeting, so recording starts by itself when the meeting begins. The file still goes to the organizer's Drive. To pull the video into your own account instead, Scribbl's Chrome extension saves the video, a transcript with speaker names and AI notes to your Scribbl account, with nothing joining the call.

Sources

Checked October 12, 2026. Google Meet Help, Record a video meeting, checked again October 19, 2026.

Try Scribbl

Keep every Meet recording in your account

Scribbl records, transcribes, and summarizes your Google Meet calls from your browser. No bot joins the call. Free for 10 meetings a month, no credit card.

Add to Chrome · It's free

Try Scribbl

Keep every Meet recording in your account

Scribbl records, transcribes, and summarizes your Google Meet calls from your browser. No bot joins the call. Free for 10 meetings a month, no credit card.

A Scribbl meeting page: the video, the transcript with speaker names and the AI notes Add to Chrome · It's free

Keep every Meet recording in your account

Start free